Helicopter HVAC installation lift operations require an uncommon blend of aviation expertise, construction knowledge, and real world coordination, and this project at Macy’s West County Mall in Des Peres, Missouri highlighted exactly why Fair Lifts continues to be trusted for complex commercial lifts. Completed on November 16, 2025, this operation supported a critical electrical upgrade in partnership with Bell Electrical Contractors and the Macy’s facilities team.
Laying the Groundwork at West County Mall

Kaman K-MAX hovers above the Macy’s roof.
The work took place at 2 W County Center, Des Peres, MO, a busy retail environment where minimizing disruption was a top priority. The structure height was approximately 40 feet, with a staging area set and ready in the mall parking lot. While there were no crane restrictions on paper, the team identified early on that a helicopter HVAC installation lift would provide the most efficient and least intrusive solution.
The scope included removing an existing rooftop generator weighing 6,300 pounds and installing a new generator with a net weight of 4,482 pounds. Through strategic planning and component optimization, the total lift weight was reduced to a maximum of 5,100 pounds, aligning perfectly with the selected aircraft’s lift profile.
Early Coordination With Bell Electrical and Macy’s Teams

The teams coordinate in the staging area.
Bell Electrical Contractors brought valuable experience to the project, having previously worked with both crane and helicopter supported installations. Since April 2025, Fair Lifts worked closely with Jim’s team at Bell Electrical and the professionals at Macy’s to develop a customized timeline and pricing structure that supported operational needs without compromising safety or precision.
This collaboration was marked by consistent communication, transparency, and a shared problem solving mindset. Every detail of the helicopter HVAC installation lift was reviewed well in advance, allowing all parties to enter lift day with clarity and confidence.
Selecting the Right Aircraft for Precision and Control

The K-MAX lifting the new HVAC unit to the roof of Macy’s.
For this project, Fair Lifts deployed the Kaman K-MAX, an aircraft purpose built for external load operations. Known for its intermeshing rotor system and exceptional vertical lift efficiency, the K-MAX is widely regarded as one of the most precise and reliable helicopters for construction and utility work.
The K-MAX allowed Fair Lifts to perform stable, controlled lifts with minimal rotor wash and exceptional load visibility. This made it ideally suited for the rooftop environment at Macy’s, where accuracy and control were critical to protecting the structure and surrounding infrastructure.
Clearing the Path for a Successful Lift

The ground crew prepping the new generator in the staging area.
Although the parking lot provided an effective staging area, the site required thoughtful preparation to ensure safe flight paths and clear load movement. The Macy’s team coordinated the temporary removal of light poles and the relocation of select trees to create unobstructed access for the aircraft.
These proactive measures significantly reduced risk and contributed to the smooth execution of the helicopter HVAC installation lift. The effort demonstrated a strong commitment from all stakeholders to doing the job correctly rather than taking shortcuts.
Managing Safety and Performance From the Ground Up

The lift crew preps the original HVAC unit for removal.
Every helicopter HVAC installation lift executed by Fair Lifts follows a disciplined planning and safety process. For this project, our team conducted detailed load calculations, rigging evaluations, and flight planning sessions well ahead of the scheduled lift.
On lift day, Fair Lifts managed all aerial operations, ground coordination, and communication protocols. The Kaman K-MAX performed flawlessly, allowing for precise removal of the existing generator and accurate placement of the new unit onto the rooftop. The operation was completed efficiently and without incident.
Where Planning and Execution Paid Off

The new HVAC generator after placement.
The success of this helicopter HVAC installation lift reflected the strength of a true partnership. Client feedback emphasized the exceptional communication, attention to detail, and thoroughness demonstrated throughout the project lifecycle. From early planning stages through final execution, the collaboration allowed each team’s expertise to shine.
Fair Lifts is proud to have supported Bell Electrical Contractors and Macy’s in delivering a critical infrastructure upgrade with minimal disruption to mall operations. Projects like this reinforce the value of helicopter lift solutions for commercial environments.
Elevating Commercial Projects Through Helicopter Lift Solutions

The Kaman K-MAX sits parked in the staging area.
In active retail settings, helicopter HVAC installation lift solutions offer clear advantages over traditional access methods. Reduced setup time, minimal ground impact, and unmatched placement precision allow essential upgrades to be completed efficiently while maintaining daily operations.
Fair Lifts continues to provide specialized helicopter lift services across commercial, industrial, and utility sectors. This project at Macy’s West County Mall stands as a strong example of how experience, preparation, and teamwork deliver outstanding results.